JD-2.5 Type Mining Dispatch Winch
Introduction of JH-20 Mining Pulling Winch for Prop
The disassembly sequence and installation of the mine winch are reversed. First, it must be broken down into components, and then the components will be disassembled. When disassembling, the protectiv
The disassembly sequence and installation of the mine winch are reversed. First, it must be broken down into components, and then the components will be disassembled. When disassembling, the protectiv
The brake system must be turned on before the two-speed winch server is working normally. After the brake system is turned on, restart the main motor and run the winch motor. Press the winch forward/t
Mining Dispatch Winch uses planetary gearing. The winch has the characteristics of compact structure, good rigidity, high efficiency, convenient installation and movement, stable starting, flexible op