CONTACT US
  • Tel/Wechat/Whatsapp:+86-18660761303
  • Fix: +86-537-2350961
  • Email:sales@chinacoalintl.com
  • Address:No. 11, North of Kaiyuan Road, High-tech Zone, Jining City, Shandong Province, China
Position:Home  /  Product Wiki  /  How Does The Painting Work Of Double Drum Hoist Winch Work?

How Does The Painting Work Of Double Drum Hoist Winch Work?

Date:2019-06-14     Label:

Double Drum Hoist Winch

Hoist Winch

Winch

Any mechanical equipment will not be exposed directly to the metal surface. They will be painted with a layer of paint. The paint can isolate the air and water from corroding the metal surface and prolong the service life of the machine. On the other hand, the color of the paint can be highlighted. The design features of this mechanical equipment have also played a prominent role, especially in the two-speed winch working in this environment under the coal mine. The importance of painting is self-evident.

Painted Double Drum Hoist Winch to avoid direct contact between metal surfaces and air and moisture, extending the life of the equipment. On the other hand, Double Drum Hoist Winch painted in the poor environment of coal mines. It can make others discover in time and it is very eye-catching.

Double Drum Hoist Winch's first painting process is to treat the surface, because the surface may not be clean, there are all kinds of dirt, dust, coal dust, if these things are not wiped clean, direct paint will reduce the paint Adhesion is easily peeled off at a later stage, so that the metal surface is exposed again and accelerates corrosion.

Uneven surface can also affect the painting work of Double Drum Hoist Winch. The uneven surface can also make the paint easy to peel off, so it is necessary to treat the surface, which can increase the contact area of the surface, especially the polished Double Drum Hoist. Winch will make the contact closer.
It should be noted that the painting of Double Drum Hoist Winch generally has two layers, primer and topcoat. Before painting, the paint needs to be fixed on the ground and then sealed. It must be sufficient, but not too much. It is strictly forbidden to use thinner materials directly under the well.

+

+

Please leave a message
skype
message