In the past, we have also compiled a set of “scheduled winch installation standards and specifications” that you can view. However, it is for reference only. It is well known that when installing the Underground Mining Scraper Winch, it is necessary to customize a range of different Underground Mining Scraper Winch installation standards and specifications depending on the mine environment.
Let's take a look at the details that are easily overlooked when installing the Underground Mining Scraper Winch:
The distance between the newly installed Underground Mining Scraper Winch motor and the wall must be 50 cm, or half a meter. The winch motor is too close to the wall, which can affect the heat dissipation of the motor and cause the motor to burn out. The safety of coal miners, even temporary winches, must be installed in accordance with regulations to ensure the safety of the winch.
The lanes and chambers of small winches should meet the design requirements to meet the requirements of winch installation and driver operating space. The quality of the project must be good, there is no equipment nearby to hinder the driver's operation, affecting the operation of the winch, affecting the driver's line of sight and attention. Facilities, etc. If the diverticula does not meet the requirements for installation of the winch, the installation can be rejected.