Underground Mining Scraper Winch continually summarizes operating experience, explores operating methods, and improves the level of operation technology; Chapter 5: Strict operation, inspection, and maintenance of Underground Mining Scraper Winch for frequency conversion mines. Control traction load. It is strictly prohibited that the motor does not send electricity when the load is dropped Brake releases; check and maintain frequently, pay attention to the contact between brake shoe and brake wheel (or brake disc).
Grease falls between the brake band and the brake wheel. Because Underground Mining Scraper Winch needs to be lubricated during use, if it is not handled carefully, grease will fall between the brake band and the roller, which will reduce the friction. , Which caused Underground Mining Scraper Winch to fail.
The speed measurement and speed limiting system and the control system are composed of AC or DC motors. According to the working principle of the hoisting wire rope, it is divided into winding mine hoist and friction mine hoist. There are two types of winding mine hoist: single reel and double reel. The winding method of the steel wire rope on the reel is similar to the general Underground Mining Scraper Winch.
Underground Mining Scraper Winch adopts oil sample analysis, and through the analysis of lubricant fluid to achieve the purpose of fault diagnosis. After a reasonable sampling and analysis of the working oil (fat), you can obtain information about the wear status of each friction pair of the mechanical equipment: including the wear site, wear mechanism, and degree of wear, etc. Make scientific judgments.
Although it has the characteristics of high versatility, compact structure, small size, light weight, heavy lifting, convenient use and transfer. However, it also requires maintenance. Effective commissioning and maintenance can effectively extend the service life.
Underground Mining Scraper Winch is set according to specifications. Its specification net height is not less than 2.0 meters, net width is 2.4 meters, and net depth is 2.0 meters. The roadway along the road is determined according to the actual situation of the roadway, and it is based on the principle of not affecting the safe operation.